Crews on call 24/7/365

Emergency line 540-242-3470
540-242-3470
BUILD

Northern Virginia & the Shenandoah Valley

Reconstruction & Rebuild

Selective demolition, architect and engineer drawings, permits, and a complete rebuild managed by our project managers.

Interior of a house stripped to the framing during selective demolition

Once the claim is approved, it is time to rebuild. For our clients and project managers alike, it is the most rewarding part of the job: turning a damaged property back into a home or business.

We handle the whole process: careful demolition of damaged materials, architect or structural engineer drawings when needed, building permits, and a rebuild overseen by one of our experienced project managers. If you want to make improvements along the way, we can work those in too.

Reconstruction & Rebuild at a glance

Management
A dedicated project manager, with the owners involved
Permits
Architect or engineer drawings and building permits handled for you
Timeline
A few weeks for a single room; several months for major losses
Service area
Northern Virginia (Loudoun County, Fairfax County, Prince William County and more); Shenandoah Valley (Rockingham County, Augusta County, Shenandoah County and more)
Call 24/7
540-242-3470

What the rebuild covers

  • Selective demolition and debris removal
  • Architect and structural engineer drawings
  • Building permits and inspections
  • Framing, roofing, siding, and windows
  • Electrical, plumbing, and HVAC through licensed trades
  • Drywall, cabinets, flooring, paint, and finishes
Carpenter measuring new framing during a home rebuild

Our process

  1. 01

    Demo

    Damaged contents and building materials are removed carefully, protecting what can be saved.

  2. 02

    Design

    An architect or structural engineer evaluates the damage and prepares repair drawings.

  3. 03

    Permit

    We submit drawings and secure the building permits needed to start construction.

  4. 04

    Schedule

    Your project manager sets the schedule and coordinates every trade.

  5. 05

    Build

    Framing through finishes, with regular updates so you always know what is happening next.

  6. 06

    Walkthrough

    A final walkthrough with you to make sure everything is done right before we call it complete.

Before we arrive

What to do right now

  • Keep a list of finishes and features you want restored.
  • Tell us early about any upgrades you are considering.
  • Keep your adjuster’s contact information handy.
  • Ask us anything. Your project manager is a phone call away.
Call 540-242-3470

Reconstruction & Rebuild FAQ

Questions we hear most.

01 How long does a rebuild take?

It depends on the size of the loss and permitting. A single room may take a few weeks; a major fire rebuild can take several months. Your project manager will give you a realistic schedule up front.

02 Can I add upgrades or an addition during the rebuild?

Yes. We have integrated kitchen redesigns and even additions into insurance rebuilds. Upgrades are priced separately from the covered work.

03 Who will I be working with?

You will work directly with the owners and a dedicated project manager from start to finish, not a rotating cast of subcontractors.

24/7 emergency response

Damage doesn’t wait. Neither do we.

Call any time, day or night, to talk with someone who can help right now, or send a request and we will get back to you quickly.

Call 24/7 Request help